TRANZ-Patent Pending

TRANZ-Patent Pending

Take Action

Créer le: avril 25, 2012
Dernière mise à jour

Stade de l'Innov'Action
1. Idée
2. Start-up
3. Evolution
4. Mise en oeuvre
5. Portée

SakeTranz (Tranz).Tranz is an automated underground transportation system which runs on mono rail inside a small tunnel approx 3 Fits radius (like a big water supply pipe) powered by electric engine. These tunnels are laid few fits down the road.Tranz runs into single track in circular way so it does not require track change as well.Tranz is collection of bogies/trolley which could be many in numbers like 200+ or as per need of any city. Each bogie accommodate single person. Since Tranz runs into a tunnel it is easy to construct and also does not interrupt ongoing traffic. Many Tranz tracks can be constructed in small area/lane.

http://saketranz.com/

Problem

Current transportation is not effective in field of mass communication result to which many problems are arising like traffic congestion, pollution,heavy cost,accidents and many more count less negative impacts. Constructing Metro rails/Tube every place is not feasible due to heavy cost involved in that.Tranz is answer for all these needs.

Solution

Tranz will run few fits down the road in a tunnel by electric engine. It will be a vehicle of multiple bogies with single sitter capacity. Number of bogies depends on the need of any city it could be any numbers for example 50,100,200 etc.Tranz will run on mono rail and it’s wheel will be upside attached with Track. It will run in circular way so there is no need of track changes.

Exemple

• It’s easy to construct and takes very less time. • It is cost effective with less maintenance charge. • It’s safe system to travel, since there is no chance of accident or collision or derail. • Its pollution free since it usage electricity. • Its fast way to communicate. • It’s very cheap comparing to other transportation system • It’s comfortable and easy to use for any one. • It’s easily accessible from any point of the city.

Marché

Tranz’s Capacity will depend on the frequency and Number of bogies in each vahicle .Here I am considering an example of point to point Tranz with 200 capacities and frequency as every one minute of interval. In this case from point A to Point B Tranz will run with 1 minute interval that means at point A Tranz will be available after every 1 minute. Tranz Bogies =200 (200 people 1 person each bogie) Frequency = 1 Minute Capacity = 6000 people each way by each Tranz (From point A to Point B) 6. Vehicle, tunnel and platform description (This is based on 200 bogies each vehicle it may vary by number of bogies) • Vehicle Height – 5 fit • Vehicle Length-150 Miters approx. • Vehicle width 2.5 fit. • Weight- 1.5 ton. • Sitting capacity -1 person each bogie total 200 persons each vehicle. • Platform length-150 miters. • Platform width -5 fits. • Platform Height -7 fits. • Tunnel radius-3 fits. • Assembly/Parking area length 150 miters. • Assembly/Parking area width 5 fits. • Assembly/Parking area Height 7 fits. • Since Tranz will run down the road it can go to very high speed for safety we can consider 150 KM/H max speed.

Meet the Creator

Impliquez-vous

There are no offers/needs.

Connections:
No one has connected with Saket Agrawal yet! Be the first to make a connection in the growth tracker area below!

Comments & Activity

view all...

Commentaires & Activités

Commentaires

ven, 27/04/2012 - 11:01

visit here for more details http://saketranz.com/